For some strange reason, those words are stuck in my head. Anyhow, another week of work is finally over for me, but this time I get to work through my weekend. I have a project going on that has required much of my time. Redundancy annoys me, and it leaves much room for transposing and transferring errors. However at midnight, all of the readings that have been taken throughout the day at my plant on paper are put into Excel spreadsheets. From there, they are written onto several other forms, and from those forms, put back into different spreadsheets. Honestly, I think there is one more layer to that redundancy, and when the end of the month comes along it gets about three layers deeper of paper to pc to paper to pc... It makes my nerves twinge any time I have to do the paper work at the end of the night. Solution... put everything on one damn spreadsheet and link the cells that need to be linked into the other spreadsheets. Wow, that's thinking like 1995. Anyhow, I made up a sample month for this past month, and it went over rather well, so now I have to build spreadsheets for the rest of the year. I have created a lot of work for myself to get rid of redundancy, but its ok, I still get paid by the hour.
Besides all that Mrs. Kennedy, I thought the parade was fine.